EN
Blog

Working Time Records and 2027 Bank Holidays in Andalusia

Working time records with the 2027 calendar: Andalusian holidays on a Monday and Saturday, holiday working, overtime and what to do before January.

Gesthoras team · Infonet Consultores5 min read

Cover with the text “Working time records and 2027 holidays” next to the Gesthoras RecLog terminal screen showing a successful record

You have the 2027 shift rota open, and working time records for next year start with knowing which days are bank holidays. The BOE (Spain's Official State Gazette) of 13/10/2026 published the 2027 public holidays: Andalusia has 12, under Decree 84/2026. Andalusia Day moves to Monday 01/03/2027, while 01/05/2027 and 25/12/2027 fall on a Saturday and are not moved. Below you will see what each date means for your shifts, how to record a holiday worked and what to have ready before January.

Which 2027 holidays change the count in Andalusia

The Resolution of 08/10/2026 of the Directorate-General for Labour (Dirección General de Trabajo), published in the BOE of 13/10/2026, sets out the 2027 public holidays for all the regions. In Andalusia there are 12 holidays, set by the Junta's Decree 84/2026, and each municipality adds two local holidays. These are the dates that cause the most work when balancing the year:

DateWhat happensWhat to check in your small business
Monday 01/03/2027Andalusia Day moves to the MondayA long weekend for Monday-to-Friday staff; shifts that Monday that need covering
Saturday 01/05/2027Falls on a Saturday and is not movedIf you close on Saturdays, there is no extra day off; if you open (shop, workshop, warehouse), that Saturday is a bank holiday
Saturday 25/12/2027Falls on a Saturday and is not movedAs with 01/05/2027, right in the middle of the weekend shift season
Local holidaysTwo per municipalityAdd them separately to the calendar of each workplace
With the region's 12 holidays the calendar is still incomplete. If you have sites in several municipalities, load the two local holidays for each one before assigning shifts and leave, because a forgotten local holiday ends up as a day with clock-ins nobody expected.

How to balance shifts and staff leave

Monday or Saturday seems a minor detail until you build the rota. The effect changes depending on how each site works, so look at them separately.

Office, Monday to Friday

Monday 01/03/2027 leaves three days in a row with no office. The two Saturday holidays, on the other hand, take no working day away. Count leave days with the calendar already loaded, so nobody requests a Monday that is already a holiday; you will find more detail in how to manage holidays and absences without spreadsheets.

Businesses open on Saturdays

In a shop, workshop or warehouse that works on Saturdays, 01/05/2027 and 25/12/2027 are either two closure days or two holidays worked. Decide early who is off and who is in, because those hours will need to appear in each person's record.

Rotating shifts

A holiday on a Monday throws out the whole week for the shift starting that day. Review the February and March rota and the rest periods between shifts, as explained in time tracking with rotating shifts and split shifts.

Working time records on a holiday worked: what the law requires

The daily working time record has been in force since 12/05/2019. Article 34.9 of the Estatuto de los Trabajadores (Spain's Workers' Statute) requires the exact start and end time for each person, every day, and that the record be kept for 4 years and made available to staff, their representatives and the Labour Inspectorate (Inspección de Trabajo). A holiday worked is clocked like any other day. Go over the basics on the working time record page.

Hours worked on that holiday beyond the ordinary working day count as overtime. Article 35.5 of the same Statute requires them to be recorded day by day and totalled over the pay period, with a copy of the summary given with the payslip. You have it step by step in overtime: how to record and compensate it.

With part-time contracts, be more precise. Article 12.4.c requires their working day to be recorded day by day and totalled every month, and if the record fails, the contract is presumed to be full-time, unless proven otherwise. Before assigning a Saturday holiday to someone on a part-time contract, see what must be recorded for part-time contracts.

At a site using Gesthoras, whoever starts on Monday 01/03/2027 taps their NFC key fob on the RecLog terminal at the door and the screen confirms the clock-in with the date and time.

RecLog terminal screen after clocking in with the NFC card: successful record with the date and time of the clock-in

Whoever works that holiday away from the site or from home clocks in with their personal link from their mobile or computer, pressing the clock-in button when they start.

Gesthoras app on a mobile phone with a large clock and the green ENTRAR button to clock in

If someone leaves without clocking out on a holiday with half the site empty, the automatic end-of-day closure closes the record at the time you have set, and you can change that time. At the end of the month you download the reports in PDF and Excel and pass them to your accountancy firm with each person's hours.

If the 2027 holidays are going to catch you with a paper sign-in sheet or the usual Excel file, Gesthoras records every clock-in and clock-out with an NFC key fob, mobile or computer and gives you the month's report ready to download: request information for your workplace.

And the digital time record? Still in progress

The Minister of Labour said on 23/10/2026 that the regulation on the working time record is still being processed. The royal decree has not been approved or published in the BOE and has no date. To plan for 2027, work with the rules currently in force; according to the draft, the record would become digital, so it is worth preparing. In digital working time record: what changes and what stays the same you will find what that draft says.

What to get done before January

  1. Load the 12 Andalusian holidays and the two local holidays for each workplace.
  2. Settle who works on Monday 01/03/2027 and on Saturdays 01/05/2027 and 25/12/2027, starting with part-time contracts.
  3. Check that your record produces a monthly summary of hours per person, with overtime shown separately.

If you want to see how a holiday worked looks in the monthly report, start for free with no card needed or ask how Gesthoras adapts to your 2027 shifts; you can also call +34 959 540 712.

More articles from the blog

See all

Let’s talk about your business

Our team of experts is ready to help you optimise your time tracking and boost your productivity.

Online support

We are available for your team. WhatsApp +34 621 39 39 47

Sales

Plans tailored to your company. +34 959 54 07 12 · contacto@infonetconsultores.com

Location

Our head office in Huelva (Spain). C/ Lentisco 3, of. 13 · View on map

Join smarter time tracking Start free with no card, and cancel whenever you like.
How it works RecLog Productivity Pricing Contact
Log in Start for free